NEWS:
TURRET MOORING SYSTEM FOR THE LIBRA FIELD FPSO
SVR moorings brings excellence in moorings design, because of this we got first project of about $ 110m where we are partner with LMC for mooring lines, analyse the risers and provide engineering support or integration of the turret and swivel stack.The floater will have capacity to handle 50,000 barrels of oil 4 billion cubic metres of gas per day and is scheduled to start operations in the fourth quarter of 2016.
ATALANTA FIELD BLOCK BS-4,SANTOS BASIN,BRAZIL
Atlanta Field is a post-salt oil field located 185km off the coast of Rio de Janeiro in Block BS-4 of Santos basin, at a water depth of 1,550m. FPSO Petrojar 1, will be modified to Brazilian standards, SVR moorings got a opportunity to design the moorings and suction anchor for this multi million project. The service by SVR will be finished by December 2015 and production will be begin from mid of 2016.
S
Atlanta Field is a post-salt oil field located 185km off the coast of Rio de Janeiro in Block BS-4 of Santos basin, at a water depth of 1,550m. FPSO Petrojar 1, will be modified to Brazilian standards, SVR moorings got a opportunity to design the moorings and suction anchor for this multi million project. The service by SVR will be finished by December 2015 and production will be begin from mid of 2016.
S
ICHTHYS LNG PROJECT,BROWSE BASIN,WESTERN AUSTRALIA
SVR moorings was recently contracted by INPEX to act as an independent outside party to verify the design of the mooring system for the new world largest submersible platform CPF(Central Processing Facility) .Detailed analyses of loads, motion characteristics and capabilities need to be performed to ensure that the mooring system design suffices.The production of gas from this platform was shceduled to start on end of 2016.
SVR moorings was recently contracted by INPEX to act as an independent outside party to verify the design of the mooring system for the new world largest submersible platform CPF(Central Processing Facility) .Detailed analyses of loads, motion characteristics and capabilities need to be performed to ensure that the mooring system design suffices.The production of gas from this platform was shceduled to start on end of 2016.